| Proposal | Approval of details reserved by condition imposed under Y/49/21/RES relating to conditions 3-in curtilage cycle stores; 4-Landscaping Measured Works Schedule, 5-alternative surfacing to those pathways shows as hoggin, 7-proposed location of required fire hydrants, 10-proposed footpath/cycle links between the ends of the cul-de-sacs on perimeter of site are at least 3m wide and feature some form of modal filler, 11-continuous footway outside plot 214 & 12-retention of existing metal estate fencing around sheep field & replacement of damaged sections and removed old sections. |