| Proposal | Non material amendment following the grant of BE/135/18/PL to reduce building depth by c 3.5m, roof profile changed - now monopitch rather than portal frame, roof material amended (now single ply to suit low pitch roof) and rooflights omitted, vertical cladding shown to south elevation, additional fire exit door shown to south elevation, 3 No revolving and 3 No accessible doors to showrooms omitted and replaced with 2 No. bi-parting 'drum' doors, curtain walling layout updated to reflect the above, 1 No high-level fixed window (north elevation) changed to louvre serving workshop, Louvre shown to plant room (south elevation), internal layout amended to client's requirements; remainder of mezzanine now shown as expansion space, dry Valet and wet Valet buildings combined; vertical cladding shown to south elevation & external areas updated to suit. |